Appendix II Key Statistics and Data
Environmental Performance
Energy Consumption
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
|
---|---|---|---|---|---|---|---|
By the DSD (302-1) |
|||||||
Gasoline |
Pool cars |
GJ 1 |
825 |
627 |
599 |
379 |
533 |
AM cars |
GJ 1 |
3,497 |
3,173 |
3,422 |
2,874 |
2,837 |
|
Electricity purchased 2 |
GJ 1 |
992,808 |
1,024,092 |
1,082,376 |
1,054,656 |
1,081,184 |
|
Purchased electricity consumption per unit volume of sewage treated |
kWh |
0.27 |
0.28 |
0.30 |
0.28 |
0.29 |
|
Total equivalent electricity generated from renewable energy sources 3 |
Million kWh |
34.68 |
21.70 |
28.15 |
28.50 |
27.96 |
|
Biogas 4 |
Million m3 |
10 |
7 |
9 |
8 |
9 |
|
By the DSD's Contractors (302-2) |
|||||||
Gasoline |
GJ 1 |
6,834 |
4,473 |
4,525 |
4,035 |
5,191 |
|
Diesel |
GJ 1 |
42,601 |
12,540 |
16,566 |
39,106 |
67,626 |
|
Electricity |
GJ 1 |
97,798 |
56,616 |
16,480 |
22,693 |
14,808 |
1. Conversion factors for standardising units to GJ are gasoline (0.033 GJ/L), diesel (0.036 GJ/L), electricity (0.0036 GJ/kWh). Since different conversion factors are adopted in estimation methods, the significant figure of energy consumption are slightly different.
2. The total electricity consumption includes the offices at Kowloon Government Offices, Western Magistracy, and the DSD's flood prevention and sewage treatment facilities (including sewage treatment works, sewage pumping stations and stormwater pumping stations). Electricity consumption at office at Revenue Tower is not applicable.
3. The renewable energy sources harnessed by the DSD include hydropower, solar power and biogas.
4. Generated from sewage treatment works.
Greenhouse Gas (GHG) Emissions 5
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
|
---|---|---|---|---|---|---|---|
By the DSD |
|||||||
Electricity purchased (Scope 2) 6 (305-2)
|
Tonnes CO2e |
193,046 |
199,129 |
210,462 |
205,072 |
210,230 |
|
Gasoline Combustion (Scope 1) (305-1) |
Pool Cars |
Tonnes CO2e |
65.90 |
44.83 |
42.85 |
27.08 |
38.07 |
AM Cars |
Tonnes CO2e |
249.93 |
226.79 |
244.53 |
205.43 |
202.79 |
|
By the DSD's Contractors (305-3) |
|||||||
Electricity purchased (Scope 3) |
Tonnes CO2e |
19,016 |
11,009 |
19,019 |
4,412 |
2,879 |
|
Fuel consumption (Scope 3) 7 |
Tonnes CO2e |
3,561 |
1,218 |
1,511 |
3,089 |
4,749 |
5. GHG emission were calculated based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department and Electrical and Mechanical Services Department, HKSAR in February 2010. Types of GHG include CO2, CH4 and N2O.
6. Scope 2 GHG emissions were calculated based on a territory-wide default value of 0.7 kg/kWh.
7. Generated from stationary combustion of diesel and mobile combustion of petrol i.e. vehicle consumption. GHG emissions from vehicle consumption by the DSD's contractors was calculated based on the assumption that all vehicles were passenger cars that consume gasoline. The DSD will continue optimising the data collection method to enhance data accuracy.
Water Consumption 8 (301-1, 303-3, 303-5)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Freshwater consumption at flood prevention and sewage treatment facilities |
m3 |
2,050,936 |
2,433,500 |
2,191,991 |
2,436,440 |
2,525,919 |
Daily reclaimed water produced at sewage treatment facilities |
m3 |
1,512 |
1,332 |
1,340 |
1,861 |
1,576 |
Percentage of reclaimed water used |
% |
0.07 |
0.05 |
0.05 |
0.08 |
0.06 |
8. Freshwater and reclaimed water consumed by the DSD are renewable materials.
Sewage Treatment
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
|
---|---|---|---|---|---|---|
Volume of sewage treated (102-7) |
Million m3 |
1,007 |
1,015 |
1,007 |
1,028 |
1,033 |
Biochemical oxygen demand removed from sewage |
Tonnes |
124,569 |
151,406 |
146,159 |
132,797 |
132,089 |
Suspended solids removed from sewage |
242,933 |
277,232 |
223,165 |
194,751 |
207,672 |
|
Nitrogen removed from sewage |
6,551 |
6,683 |
7,106 |
7,388 |
7,084 |
|
Dewatered sludge removed from sewage |
392,396 |
410,526 |
386,137 |
392,140 |
381,045 |
|
Screenings removed from sewage |
15,172 |
14,823 |
14,970 |
14,292 |
12,842 |
|
Grits removed from sewage |
6,631 |
6,513 |
4,996 |
5,721 |
4,981 |
Waste Management 9 (306-3)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Construction and Demolition (C&D) Materials |
||||||
C&D waste disposed to landfills 10 |
'000kg |
6,998 |
5,801 |
2,273 |
2,335 |
6,188 |
C&D waste disposed to public fill areas 11 |
'000kg |
235,735 |
170,162 |
155,469 |
151,918 |
68,491 |
Recyclable Waste Collected |
||||||
Waste paper 12 |
kg |
19,360 |
20,587 |
15,954 |
20,087 |
15,083 |
Aluminium cans 13 |
kg |
19.73 |
29.51 |
32.23 |
92.21 |
86.76 |
Plastic bottles 13 |
kg |
20.71 |
18.76 |
22.72 |
52.66 |
45.53 |
9. The DSD centrally collects waste data from different divisions and contractors.
10. Waste includes metals, plastics, paper/cardboard packaging waste and other wastes, such as general refuse.
11. Waste include bricks, concrete, building debris, rubble and excavated soil.
12. The amount of waste paper collected did not include those collected from project sites.
13. The amount of aluminium cans and plastic bottles collected did not include those collected from the Western Magistracy as the data were not available.
Material Consumption 14 (301-1)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
By the DSD |
||||||
Total paper consumption |
Reams |
9,608 |
9,285 |
9,231 |
9,223 |
9,091 |
A4 paper |
9,357 |
8,992 |
8,854 |
8,817 |
8,726 |
|
A3 paper |
251 |
293 |
377 |
406 |
365 |
|
Purchased A4/A3 paper with recycle content |
Reams (% of total paper purchased) |
9,608 |
9,285 |
9,231 |
9,223 |
9,091 |
Paper consumed per staff (By establishment) |
Reams |
5.0 |
4.8 |
4.8 |
4.6 |
4.5 |
By the DSD's contractors |
||||||
Rebar |
Tonnes |
7,165 |
10,643 |
13,325 |
11,811 |
14,998 |
Steel |
Tonnes |
3,171 |
3,402 |
5,042 |
4,159 |
9,843 |
Bricks |
m3 |
30 |
5,817 |
1,993 |
126 |
140 |
Cement |
Tonnes |
2,406 |
2,248 |
3,500 |
763 |
2,181 |
Cement mortar |
m3 |
263 |
640 |
1,946 |
873 |
812 |
Concrete |
m3 |
50,616 |
73,175 |
74,651 |
52,150 |
57,418 |
Sand |
Tonnes |
12,586 |
24,117 |
23,111 |
2,602 |
6,857 |
Stones |
Tonnes |
9,617 |
31,898 |
26,775 |
8,762 |
6,326 |
Office paper |
Tonnes |
27 |
40 |
74 |
20 |
66 |
14. Except for paper, which is a renewable material, others are non-renewable materials.
Greening
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Total no. of trees planted |
Tree |
2,300 |
10,000 |
1,300 |
64 |
239 |
Area of green roof added |
m2 |
4,015 |
4,200 |
4,150 |
2,028 |
7,359 |
Social Performance
Staff
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Staff establishment (102-7) |
No. |
1,914 |
1,937 |
1,940 |
1,986 |
2,020 |
Directorate |
No. |
18 |
18 |
18 |
18 |
18 |
Professional |
No. |
310 |
310 |
307 |
327 |
346 |
Technical & Site Supervisory |
No. |
865 |
884 |
888 |
908 |
920 |
General & Common Grades |
No. |
526 |
531 |
533 |
538 |
540 |
Model Scale I |
No. |
195 |
194 |
194 |
195 |
196 |
Training |
||||||
Training courses 15 |
No. |
654 |
674 |
638 |
681 |
600 |
Trainees |
No. |
8,019 |
9,042 |
8,033 |
10,011 |
6,873 |
Training hours received |
Hours |
58,520 |
57,737 |
60,524 |
66,110 |
58,781 |
Average training hours per staff (Based on the staff strength) |
Hours |
33.0 |
33.4 |
35.0 |
38.4 |
33.9 |
Total expenditure on training (Includes local training only) 15 |
$ |
3,585,011 |
3,046,283 |
2,929,551 |
2,701,879 |
3,772,082 |
15. It includes internal and external seminars, workshops, training courses, visits and training courses held by Civil Service Training and Development Institute and staff-initiated external courses.
Staff Breakdown in 2019-2016 16 (102-8)
|
Unit |
By Strength |
---|---|---|
No. of Staff |
No. |
1,736 |
By Post |
||
Directorate |
%(No.) |
1.04 (18) |
Professional |
18.78 (326) |
|
Technical & Site Supervisory |
49.14 (853) |
|
General & Common Grades |
23.44 (407) |
|
Model Scale I |
7.60 (132) |
|
By Employment Type |
||
Full-time |
%(No.) |
100 (1,736) |
Part-time |
0 (0) |
|
By Employment Contract, by Gender |
||
Permanent (Male) |
%(No.) |
80.93 (1,405) |
Permanent (Female) |
19.07 (331) |
|
By Age |
||
Age 20-29 |
%(No.) |
12.04 (209) |
Age 30-39 |
25.12 (436) |
|
Age 40-49 |
28.00 (486) |
|
Age 50-59 |
31.51 (547) |
|
Age 60 or above |
3.34 (58) |
|
By Nationality |
||
Local |
%(No.) |
100 (1,736) |
Non-local |
0 (0) |
16. The majority of our operations are performed by the DSD's employees.
Senior Management Breakdown in 2019-20 (405-1)
|
Unit |
By Strength |
---|---|---|
No. of Staff |
No. |
7 |
By Age |
||
Age 20-29 |
%(No.) |
0 (0) |
Age 30-39 |
%(No.) |
0 (0) |
Age 40-49 |
%(No.) |
0 (0) |
Age 50-59 |
%(No.) |
71.43 (5) |
Age 60 or above |
%(No.) |
28.57 (2) |
By Nationality |
||
Local |
%(No.) |
100 (7) |
Non-local |
%(No.) |
0 (0) |
By Gender |
||
Male |
%(No.) |
100 (7) |
Female |
%(No.) |
0 (0) |
Training Hours Breakdown in 2019-2017 17 (404-1)
Type of Staff |
No. of Staff |
Training Hours Received (Hours) |
Training Hours per Staff (Hours) |
---|---|---|---|
Directorate Staff |
18 |
1,366 |
75.89 |
Professional Grade Staff |
326 |
26,507 |
81.31 |
Technical, Site Supervisory, General & Common Grades and Model Scale I Staff |
1,392 |
30,908 |
22.20 |
17. As there is no distinct requirement regarding receiving training in terms of gender, therefore we do not report the data broken down by gender.
New Employees and Staff Turnover in 2019-20 (404-1)
|
New Employee 18 |
Staff Turnover 19 |
|||
---|---|---|---|---|---|
|
Unit |
Male |
Female |
Male |
Female |
By Age |
|
|
|||
Age 20-29 |
No. |
51 |
13 |
3 |
1 |
Age 30-39 |
No. |
39 |
14 |
2 |
1 |
Age 40-49 |
No. |
12 |
5 |
9 |
0 |
Age 50-59 |
No. |
7 |
0 |
0 |
2 |
Age 60 or above |
No. |
0 |
0 |
59 |
10 |
18. The above figures involve staff with their 1st appointment date falling within the period from 1 April 2019 to 31 March 2020.
19. The staff turnover figures exclude staff on inter-departmental transfer.
Community Work and Charitable Contributions (203-1)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Total number of voluntary work hours carried out by our staff |
Hours |
1,200 |
1,115 |
1,795 |
1,200 |
1,332 |
Number of voluntary projects completed |
No. |
27 |
20 |
41 |
40 |
39 |
Employee fundraising |
$ '000 |
65 |
53 |
49 |
40 |
65 |
Occupational Safety and Health (403-9)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Number of fatalities |
||||||
Number of fatalities |
No. |
1 |
0 |
1 |
0 |
0 |
The DSD staff |
0 |
0 |
0 |
0 |
0 |
|
Construction and maintenance works undertaken by the DSD's contractors |
1 (Male) |
0 |
1 (Male) |
0 |
0 |
|
Fatal accident rate per 200,000 man-hours |
||||||
The DSD staff |
- |
0 |
0 |
0 |
0 |
0 |
Construction and maintenance works undertaken by the DSD's contractors |
- |
0.022 |
0 |
0.02 |
0 |
0 |
Number of Non-fatal Accidents |
||||||
The DSD staff |
No. |
13 |
7 |
5 |
8 |
5 |
Construction and maintenance works undertaken by the DSD's contractors |
No. |
14 |
8 |
15 |
6 |
10 |
Non-fatal accident rate per 200,000 man-hours |
||||||
The DSD staff |
- |
0.40 |
0.20 |
0.16 |
0.24 |
0.16 |
Construction and maintenance works undertaken by the DSD's contractors |
- |
0.32 |
0.22 |
0.44 |
0.18 |
0.28 |
|
Unit |
2019-20 |
---|---|---|
Total hours worked |
||
The DSD staff |
Hours |
6,237,200 |
Construction and maintenance works undertaken by the DSD's contractors |
7,245,997 |
Economic Performance
The two major types of expenses in the DSD are operational expenses and public works project expenses. Our day-to-day departmental operation is financed by the General Revenue Account of the Government, while funding for public works projects are approved on a project-by-project basis by the Finance Committee of the Legislative Council. To ensure public funds are used effectively, we strive to enhance operation efficiency by adopting new technologies and management practices.
Operating Expenditure (201-1)
|
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|---|
Recurrent Expenditure |
Personal Emoluments |
$M |
882.31 |
917.19 |
916.87 |
958.68 |
1,009.37 |
Departmental Expenses 20 |
$M |
1,487.83 |
1,646.92 |
1,692.80 |
1,774.93 |
1,869.07 |
|
Capital Account Expenditure |
$M |
23.23 |
30.04 |
37.26 |
94.99 |
81.12 |
|
Total |
$M |
2,393.37 |
2,594.15 |
2,646.93 |
2,828.60 |
2,959.56 |
20. It included expenses on Mandatory Provident Fund and Civil Service Provident Fund.
Capital Works Project Expenditure (203-1)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 21 |
---|---|---|---|---|---|---|
No. of drainage projects under planning, design and construction |
No. |
18 |
18 |
24 |
24 |
{2} |
Value of drainage projects under planning, design and construction |
$M |
13,983 |
14,445 |
26,876 |
31,935 |
{1,345} |
No. of sewerage projects under planning, design and construction |
No. |
73 |
69 |
66 |
63 |
{21} |
Value of sewerage projects under planning, design and construction |
$M |
72,402 |
70,093 |
73,175 |
89,220 |
{27,031} |
21. Figures in { } are Category A projects under construction and the amount shown in money-of-the-day price; figures in [ ] are Category B projects under planning or design and amount shown in March 2020 price level.
Sewage Services Operating Accounts (102-7)
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 22 |
---|---|---|---|---|---|---|
Sewage Charge Revenue |
$M |
1,047.0 |
1,161.1 |
1,296.2 |
1,323.1 |
1,154.1 |
Trade Effluent Surcharge Revenue |
$M |
221.5 |
231.8 |
243.5 |
241.0 |
154.4 |
Other Revenue |
$M |
48.3 |
45.5 |
45.9 |
50.6 |
52.4 |
Overall Revenue |
$M |
1,316.8 |
1,438.4 |
1,585.6 |
1,614.7 |
1,455.6 |
Expenditure (Excluding Depreciation) |
$M |
(2,149.2) |
(2,340.6) |
(2,334.2) |
(2,515.4) |
(2,615.5) |
Depreciation |
$M |
(1,042.3) |
(1,518.2) |
(1,546.1) |
(1,547.0) |
(1,631.4) |
Overall Expenditure |
$M |
(3,191.5) |
(3,858.8) |
(3,880.3) |
(4,062.4) |
(4,246.9) |
(Deficit) |
$M |
(1,874.7) |
(2,420.4) |
(2,294.7) |
(2,447.7) |
(2,791.3) |
22. The 2019-20 figures are provisional and subject to endorsement by the Sewage Services Accounts Committee.
Sewage Services Operating Cost Recovery Rate 23
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Revenue of Sewage Charge and Trade Effluent Surcharge |
$M |
1,268.5 |
1,392.9 |
1,539.7 |
1,564.1 |
1,308.5 |
Expenditure (excluding depreciation) of Sewage Charge and Trade Effluent Surcharge 24 |
$M |
2,101.4 |
2,295.7 |
2,288.9 |
2,465.5 |
2,563.8 |
Operating Cost Recovery Rate |
% |
60.4 |
60.7 |
67.3 |
63.4 |
54.7 25 |
23. “Miscellaneous services” are excluded from the revenues and expenditure in this table.
24. Depreciation is not recovered through the Sewage Charge and the Trade Effluent Surcharge at present.
25. The figure reflects the waiver to sewage treatment from December 2019 to March 2020. Operating cost recovery rate before waiver was 61.8%.
Sewage Service Charge Consumption and Payment Statistics
|
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|
Number of water accounts (in thousand) |
2,907 |
2,955 |
2,989 |
3,043 |
3,078 |
Number of water accounts liable to pay Sewage Charge (in thousand) |
2,689 |
2,735 |
2,765 |
2,818 |
2,853 |
Number of accounts - Trade Effluent Surcharge (in thousand) |
25 |
27 |
28 |
29 |
30 |
Routine Services
26. The figures are provisional and subject to endorsement by the Sewage Services Accounts Committee.
27. The figures are provisional and subject to endorsement by the Sewage Services Accounts Committee.
27. The figures are provisional and subject to endorsement by the Sewage Services Accounts Committee.
Other Key Statistics
|
Unit |
2015-16 |
2016-17 |
2017-18 |
2018-19 |
2019-20 |
---|---|---|---|---|---|---|
Flood Prevention |
||||||
Total no. of flooding blackspots |
No. |
8 |
7 |
6 |
6 |
5 |
Total length of stormwater drains |
km |
2,385 |
2,386 |
2,388 |
2,427 |
2,429 |
Total length of engineered channels |
km |
361 |
363 |
363 |
363 |
363 |
Total length of drainage tunnels |
km |
21 |
21 |
21 |
21 |
21 |
Total no. of stormwater pumping stations |
No. |
36 |
36 |
36 |
36 |
36 |
Sewage Treatment |
||||||
Coverage of Public Sewerage (Population Percentage) 28 |
% |
93.5 |
93.5 |
93.5 |
93.6 |
93.7 |
Total length of sewerage network |
km |
1,728 |
1,755 |
1,770 |
1,832 |
1,841 |
Total length of sewage tunnels |
km |
42 |
63 |
63 |
63 |
63 |
Total no. of sewage treatment facilities |
No. |
300 |
304 |
314 |
319 |
324 |
Total volume of sewage treated |
Million m3 |
1,007 |
1,015 |
1,007 |
1,028 |
1,033 |
By Preliminary Treatment |
138 |
45 |
58 |
75 |
50 |
|
By Primary Treatment |
5 |
5 |
5 |
6 |
5 |
|
By Chemically Enhanced Primary Treatment |
690 |
779 |
757 |
751 |
784 |
|
By Secondary Treatment |
174 |
186 |
187 |
196 |
194 |
|
By Tertiary Treatment |
0.14 |
0.17 |
0.17 |
0.16 |
0.17 |
|
Total sewage sludge generated daily |
Tonnes |
1,048 |
1,121 |
1,043 |
1,075 |
1,041 |
Emission factor of GHG emissions due to electricity used for processing sewage |
- |
0.19 |
0.20 |
0.21 |
0.20 |
0.20 |
28. Based on the number of domestic water bill accounts with sewage charges levied.