DSD Milestones
-
1988
“Territorial Land Drainage and Flood Control Strategy Study – Phase I” commenced
-
1989
DSD established on 1 September
-
1994
Harbour Area Treatment Scheme (HATS) (formerly known as Strategic Sewage Disposal Scheme) took off
Established Flooding Blackspots System, announced 90 Blackspots next year
-
1995
Launched Shenzhen River Regulation Project by phases
First Southeast Asia's inside cavern sewage treatment plant, Stanley Sewage Treatment Works, commissioned
-
2001
HATS Stage 1 completed. Stonecutters Island Sewage Treatment Works commissioned
-
2004
First underground stormwater storage scheme completed under Tai Hang Tung Playground
-
2006
First tertiary treatment works with reclaimed water facilities in Ngong Ping commissioned
-
2008
Successively embarked on Drainage Master Plan Review Studies
-
2009
Sheung Wan Stormwater Pumping Station commissioned
Improvement of Fuk Man Road nullah was awarded based on New Engineering Contract, first outside the United Kingdom
The first river ecology improvement works in Ho Chung River was completed
-
2012
Commissioning of Hong Kong West Drainage Tunnel
Lai Chi Kok Drainage Tunnel commissioned
-
2013
Tsuen Wan Drainage Tunnel commissioned
-
2015
HATS Stage 2A commissioned. HATS is Hong Kong's largest ever environmental infrastructure project
Diesel-electric powered Clean Harbour 1 and Clean Harbour 2 set sail
-
2016
Solar farm at Siu Ho Wan Sewage Treatment Works commissioned, generating 1.1 million kilowatt-hours of electricity yearly
-
2017
Happy Valley Underground Stormwater Storage Scheme in service
Shenzhen River Regulation Project completed
-
2018
Kai Tak River Improvement Works completed
-
2019
The large-scale tertiary treatment plant, Shek Wu Hui Effluent Polishing Plant main works commenced
Relocation of Sha Tin Sewage Treatment Works to Caverns commenced