Drainage Services Department

PWP No. 4198CD

Drainage improvement works in Kwun Tong – phase 2

Project Scope

The scope of the project comprises –
(a)   construction of an underground stormwater storage tank with a capacity of about 25 000 cubic metres and the associated above ground structure at Kwun Tong Hoi Bun Road Park, and an underground stormwater pumping station and the associated above ground structure at Kwun Tong Promenade;
(b)   re-provision and enhancement of part of Kwun Tong Hoi Bun Road Park and Kwun Tong Promenade;
(c)   construction of stormwater drains of about 3.4 kilometres long with diameters ranging from 225 millimetres to 2.4 metres in the vicinity of Kwun Tong Road, Ngau Tau Kok Road, Hang Yip Street, Wai Yip Street and Hoi Bun Road; and
(d)   carrying out ancillary works

Major Improvements and Benefits

To upgrade the capacity of the drainage system concerned and alleviate the flood risks in the vicinity of Kwun Tong near Ngau Tau Kok Station

Consultants

CE 42/2020 (DS) - AECOM Asia Company Limited

Contractor

CHEC – WG Joint Venture (China Harbour Engineering Co., Ltd. – World Genius Corporation Ltd. Joint Venture)

Contract No.
DC/2024/08
Project Commencement Date
15 August 2024
Project Completion Date
Mid 2029
Project estimate

About $1,216.9 million

Controlling Division
Drainage Projects Division
Type
Flood Prevention
District
Kwun Tong
Status
On-going