The "New Engineering Contract" (NEC) is a new form of contract introduced for public works projects. Under NEC, all parties in the contract, including the project management office and the contractor, will need to follow the contract conditions under the NEC to manage the project in a partnering manner. Through the implementation of contractual partnering, a high level of mutual trust and co-operation can be established among the parties involved, thus minimizing the number of contractual disputes and avoiding delay.
NEC characteristics
- Team Spirit and goal alignment
- Pain-gain share mechanism to enhance cost effectiveness
- Reduces risk of cost and time overruns
The following DSD’s contracts are adopting NEC:
Contract No. | Contract Title | Status [Awarded Contract Sum] |
NEC Option |
---|---|---|---|
DC/2008/02
|
Improvement of Fuk Man Road Nullah in Sai Kung |
Completed |
ECC Option C |
DC/2012/01
|
Building and Civil Maintenance and Minor Works to |
Completed |
TSC Option A |
DC/2012/03
|
Happy Valley Underground Stormwater Storage |
Completed |
ECC Option C |
DC/2012/05
|
Sewerage at Yuen Long Kau Hui and Shap Pat Heung |
Completed |
ECC Option D |
DC/2012/07
|
Lam Tsuen Valley Sewerage - Village Sewerage, |
Completed |
ECC Option B |
DC/2012/09
|
Pak Hok Lam Trunk Sewer and Sha Tau Kok Village Sewerage |
Completed |
Framework |
DE/2013/05
|
Provision of Electrical and Mechanical Facilities for Tin Liu Ha Sewage Pumping Station and Tong Min Tsuen Sewage Pumping Station |
Completed |
ECC Option C |
DE/2014/03
|
Photovoltaic System at the Siu Ho Wan Sewage |
Completed |
ECC Option A |
DE/2015/03
|
Upgrading of High Voltage Switchgears and Motor Starters in Cheung Sha Wan Sewage Pumping Station |
Completed |
ECC Option A |
DE/2015/05
|
Improvement Works on Gasholder No.3 at Shatin Sewage Treatment Works |
Completed |
ECC Short Contract |
DE/2015/06
|
Improvement Works of Rotating Biological Contactors (RBC) in Ma Wan Sewage Treatment Works |
Completed |
ECC Option A |
DE/2016/07
|
Provision of Electrical and Mechanical Facilities for O Tsai Sewage Pumping Station and Enhancement Works of Electrical and Mechanical Facilities for Yung Shue Wan Sewage Treatment Works and Sok Kwu Wan Sewage Treatment Works |
Completed |
ECC Option A |
DC/2013/07
|
Drainage Maintenance and Construction in Mainland North Districts (2015 – 2019) |
Completed |
TSC Option A |
DC/2015/01
|
Relocation of Sha Tin Sewage Treatment Works to |
Completed |
ECC Option B |
DC/2015/02
|
Drainage Maintenance and Construction in Mainland South Districts (2015 – 2019) |
Ongoing |
TSC Option A |
DC/2015/05
|
Minor Drainage Improvement Works in Northern Hong Kong Island and North District |
Ongoing |
ECC Option A |
DC/2016/01
|
Construction of an Additional Sewage Rising Main between Tung Chung and Siu Ho Wan and Associated Works |
Ongoing |
ECC Option D |
DC/2016/02
|
Building and Civil Maintenance and Minor Works to DSD Plants and Facilities (2016-2020) |
Ongoing |
TSC Option A |
DC/2017/01
|
Construction of dry weather flow interceptor at Cherry Street box culvert |
Ongoing |
ECC Option C |
DC/2017/02
|
Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung |
Ongoing |
ECC Option D |
DC/2017/03
|
Upgrading of West Kowloon and Tsuen Wan sewerage – phase 1 |
Ongoing |
ECC Option B |
DC/2017/04
|
Drainage Maintenance and Construction in Hong Kong Island and Islands Districts (2017-2021) |
Ongoing |
TSC Option A |
DC/2017/05
|
Enhancement Works for Kwun Tong Sewage Pumping Station |
Ongoing |
ECC Option C |
DC/2018/01 |
Construction of Village Sewerage at Peng Chau and Mui Wo, Modification Works at Tai Po and Siu Ho Wan Sewage Treatment Works and Minor Drainage and Sewerage Works in Urban Area and New Territories |
Ongoing |
ECC Option B |
DC/2018/02 |
Upgrading of Sewage Pumping Stations and Sewerage along Ting Kok Road |
Ongoing |
ECC Option C |
DC/2018/03 |
Expansion of Sha Tau Kok Sewage Treatment Works Phase 1 and Village Sewerage in Tong To |
Ongoing [$1122.41 million] |
ECC Option C |
DC/2018/04 |
Lei Yue Mun Village Sewerage |
Ongoing [$122.55 million] |
ECC Option D |
DC/2018/05 |
Relocation of Sha Tin Sewage Treatment Works to Caverns – Site Preparation and Access Tunnel Construction |
Ongoing [$811.405 million] |
ECC Option D |
DC/2018/08 |
Inter-reservoirs Transfer Scheme – Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir |
Ongoing [$762.78 million] |
ECC Option C |
DC/2018/09 |
Rehabilitation of trunk sewers in Tuen Mun |
Ongoing [$360 million] |
ECC Option D |
DC/2018/10 |
Condition Survey and Rehabilitation of Underground Sewers and Stormwater Drains - Stage 1 |
Ongoing [$276 million] |
ECC Option B |
DC/2018/11 |
Upgrading of Central and East Kowloon Sewerage - Phase 3 |
Ongoing [$230.89 million] |
ECC Option C |
DC/2019/01 |
Drainage Maintenance and Construction in Mainland North Districts (2019-2023) |
Ongoing [$390 million] |
TSC Option A |
DC/2019/03 |
Revitalisation Works of Jordan Valley Nullah and Minor Drainage and Sewerage Works in Urban Area and New Territories |
Ongoing [$177.64 million] |
(NEC4) |
DE/2013/06
|
Provision of Electrical and Mechanical Facilities for |
Ongoing |
ECC Option C |
DE/2014/01
|
Provision of Electrical and Mechanical Facilities for |
Ongoing |
ECC Option C |
DE/2015/02
|
Term Contract for Inspection, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations |
Ongoing |
TSC Option A |
DE/2015/07
|
Provision of Electrical and Mechanical Equipment for Kau To Sewage Pumping Station |
Completed |
ECC Short Contract |
DE/2016/01
|
Provision of Electrical and Mechanical Equipment for Lok Chui Street, Siu Lam Psychiatric Centre and Fu Tei Ha Tsuen Sewage Pumping Stations |
Ongoing |
ECC Option A |
DE/2016/02
|
Provision of Electrical and Mechanical Equipment for Stage III of Sha Tin Sewage Treatment Works |
Completed |
ECC Short Contract |
DE/2016/03
|
Provision of Electrical and Mechanical Equipment for Detritor Nos. 1 and 2 of To Kwa Wan Preliminary Treatment Works |
Completed |
ECC Option A |
DE/2016/04
|
Term Contract for Waste Disposal and Minor Civil Engineering Works for Various Sewage Treatment Plants |
Ongoing |
TSC Option A |
DE/2016/08
|
Term Contract for Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations in Sha Tin and Sai Kung (2017 – 2020) |
Ongoing |
TSC Option A |
DE/2016/10
|
Provision of an Additional CHP Generating System for Sha Tin Sewage Treatment Works |
Ongoing |
ECC Option A |
DE/2016/11
|
Modification Works for Food Waste & Sewage Sludge Anaerobic Co-digestion Pilot Trial at Tai Po Sewage Treatment Works |
Ongoing |
ECC Option A |
DE/2016/13
|
Term Contract for Waste Disposal and Minor Civil Engineering Works at Various Sewage Treatment Works and Pumping Stations in the New Territories (2017 – 2020) |
Ongoing |
TSC Option A |
DE/2017/01
|
Upgrading of Kwun Tong Preliminary Treatement Works |
Ongoing |
ECC Option C |
DE/2017/03
|
Term Contract for Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations in New Territories West and New Territories North (2017-2020) |
Ongoing |
TSC Option A |
DE/2017/04
|
Provision of Deodourizing Systems and Covers for Preliminary Treatment Facilities in Tai Po Sewage Treatment Works |
Ongoing |
ECC Option A |
DE/2017/05
|
Upgrading of Screw Pumps for To Kwa Wan Preliminary Treatment Works |
Ongoing |
ECC Option A |
DE/2018/05 |
Term Contract for Inspection, Overhaul and Testing of Electrical and Mechanical Installations at Stonecutters Island Sewage Treatment Works |
Ongoing [$332.8 million] |
TSC Option A |
DE/2018/06 |
Upgrading of Tai O Wing On Street Stormwater Pumping Station |
Ongoing [$8.6 million] |
ECC Option A |
DE/2018/07 |
Provision of a Combined Heat and Power (CHP) Generating System for Tai Po Sewage Treatment Works |
Ongoing [$187.716 million] |
ECC Option A |
DE/2018/08 |
Term Contract for Overhaul, Maintenance, Testing and Plant Engineering Works of Electrical and Mechanical Installations at Various Sewage Treatment Facilities and Pumping Stations on Lantau and Outlying Islands (2019-2022) |
Ongoing [$226.5 million] |
TSC Option A |
DE/2018/09 |
Provision of Deodourizing Systems and Sludge Scrapers for Sedimentation Facilities in Tai Po Sewage Treatment Works |
Ongoing [$24.48 million] |
ECC Option A |
DE/2018/10 |
Provision of Deodourisation Units at Siu Ho Wan Sewage Treatment Works |
Ongoing [$13.43 million] |
ECC Option A |
DE/2018/11 |
Provision of Lifting Appliance Facilities for Sok Kwu Wan Sewage Treatment Works and Yung Shue Wan Sewage Treatment Works, Lamma Island |
Ongoing [$4.966 million] |
ECC Option A |
DE/2018/12 |
Term Contract for Maintenance and Overhaul of Electrical and Mechanical Installations at Various Sewage Treatment and Flood Protection Facilities in Hong Kong and Kowloon (2019-2022) |
Ongoing [$183.91 million] |
TSC Option A |
The following DSD’s consultancy is adopting NEC:
Consultancy No. | Consultancy Title | Status (Agreement Period) [Awarded Consultancy Fee] |
NEC Option |
---|---|---|---|
CE 63/2013(DS) |
Drainage Improvement Works in Happy Valley |
Ongoing |
PSC Option G |
CE 56/2014(DS) |
Relocation of Sham Tseng Sewage Treatment |
Completed |
PSC Option A |
CE 21/2015(DS)
|
Review of Drainage Master Plan in Lantau and Outlying Islands - Feasibility Study |
Ongoing [$6.0 million] |
PSC Option A |
CE 03/2015(DS) |
Yuen Long Effluent Polishing Plant - Investigation, Design and Construction |
Ongoing |
PSC Option C |
CE 54/2016(DS) |
Drainage Improvement Works at North District - Packages A and C |
Ongoing |
PSC Option A |
CE 49/2016(DS) |
Review of Drainage Master Plan in Tuen Mun, Tsuen Wan and Kwai Tsing - Feasibility Study |
Ongoing |
PSC Option A |
CE 65/2017(DS) |
Extension of Siu Ho Wan Sewage Treatment Works - Feasibility Study |
Ongoing |
PSC Option C |
CE 88/2017(DS) |
Drainage Improvement Works in Mong Kok – Investigation |
Ongoing |
(NEC4) PSC Option A |
CE 6/2018(DS) |
Drainage Improvement Works in Kwun Tong – Investigation |
Ongoing |
PSC Option A |
DP 11/2018 |
Drainage Improvement Works at Ngong Ping – Adoptive Design Review in Pre-contract Stage |
Ongoing |
PSC Option A |
Related Presentations/Videos (Recent 5 years):
Topic | Author | Date | Link/Download |
---|---|---|---|
Subcontractor Leadership Summit 2018 – Sharing on Challenges, Opportunities and Experiences in Adopting Collaborative Contract | Mr. LAI Yuk On | 12 Nov 2018 | Chinese only |
Successful Application of NEC in Government (DSD) Projects | Mr. LAI Yuk On Mr. LEUNG Cheuk Lun |
31 July 2018 | Link |
Sharing at NEC Asia Pacific Users' Group Briefing | Mr. MAK Ka Wai | 27 April 2018 | Link |
Contract Innovation through Additional Clause 2017 - Subcontracting in Happy Valley Underground Stormwater Storage Scheme (HVUSSS) | Mr. KAN Hon Shing | 29 Sep 2017 | Link |
NEC Implementation in the HVUSSS | Ms. CHENG Nga See Ellen Mr. LEUNG Cheuk Lun Mr. CHEUNG Hon Hei Mr. TONG Kwan Shing |
30 Jun 2017 | Link |
NEC in Action 2015 - Collaborative Value-engineering Management in HVUSSS | Mr. LUK Wai Hung | 10 Dec 2015 | Link |
Subcontracting in HKSAR’s NEC3 Target Cost Contracts | Mr. LUK Wai Hung and Mr. LI Chung Leung, Ricky | 10 Oct 2014 | Link |