PWP No. 4427DS

Construction and rehabilitation of sewage rising mains in Southern District

Project Scope

The scope of the project comprises –
(a)   construction of about 1.3 kilometres (km) of twin-pipe sewage rising mains with a diameter of 150 millimetres (mm) connecting Deep Water Bay Golf Club Sewage Pumping Station (SPS) to the sewerage system at Seaview Promenade;
(b)   construction of about 0.4 km of single-pipe sewage rising mains with a diameter of 100 mm connecting the Deep Water Bay No. 3 Sewage Pumping Chamber to Deep Water Bay SPS;
(c)   cconstruction of about 2.9 km of twin-pipe sewage rising mains with a diameter of 450 mm connecting Repulse Bay Main SPS to the sewerage system at Ap Lei Chau Bridge Road;
(d)   construction of a boardwalk of about 450 metres (m) in length and about 3 m in width along the northern bank of Staunton Creek Nullah in Wong Chuk Hang; and 
(e)   ancillary works

Major Improvements and Benefits

To reduce the risks of bursting of the rising mains, improve the stability of the overall sewerage system and reduce the difficulties of maintenance in the future; and to facilitate the commuting of residents in the northern bank and enhance the pedestrian connectivity of the nullah area

 

Consultants

CE 2/2019 (DS) – Binnies Hong Kong Limited

Contractor

KL – CW JV (Kwan Lee Holding Limited – Chun Wo Construction and Engineering Company Limited Joint Venture)

Contract No.
DC/2023/11
Project Commencement Date
3 January 2025
Project Completion Date
Early 2030
Project estimate

About $1,057.6 million

Controlling Division
Consultants Management Division
Type
Sewerage and sewage treatment
District
Southern
Status
On-going
Other Information