Drainage Services Department

PWP No. 4195CD

Revitalisation of Middle Tuen Mun River Channel

Project Scope

The scope of project comprise (a) beautification of the existing riverbanks along Middle Tuen Mun River Channel; (b) revamp the existing maintenance access adjacent to the riverbed with access ramps and stairs; (c) construction of viewing decks and cross-river walkways; (d) provision of dry weather flow intercepting system and water quality enhancement system; (e) provision of features for ecological enhancement and sustainable drainage system; (f) provision of a silt barrier; (g) provision/revamp of footpaths and cycle tracks, railings, pavilions and amenity areas along the riverbanks; (h) adoption of smart and innovative technologies, where applicable, to enhance the control and management of the revitalised Middle Tuen Mun River Channel; and (i) associated works including landscaping, utility works, etc.

Major Improvements and Benefits

To revitalise the existing Middle Tuen Mun River Channel and aims to transform the concrete channel into a vibrant and green environment, enhance the ecological value of the river and foster water-friendly culture.

Controlling Division
Project Management Division
Type
Flood Prevention
District
Tuen Mun
Status
Under planning & design
Back to Top