Drainage improvement works in Kwun Tong – phase 1
The scope of the project comprises (a) Construction of an underground stormwater storage tank at the Sau Nga Road Playground in Kwun Tong with a capacity of about 64,000 cubic metres and the associated electrical and mechanical facilities; (b) Construction of about 185 metres of stormwater drains in the nearby roads including Hip Wo Street; (c) Re-provision and enhancement of the Sau Nga Road Playground; and (d) Carrying out ancillary works
To improve the drainage capacity of the drainage system in Tsui Ping Road, Kai Lim Road, the nearby Kwun Tong Road and Tsui Ping River so as to alleviate the flooding risk in the areas mentioned above
KL – CW JV (Kwan Lee Holding Limited – Chun Wo Construction and Engineering Company Limited Joint Venture)
About $938.3 million