PWP No. 4191CD
Drainage improvement works at Yuen Long – stage 2
Project Scope
The scope of the project comprises –
(a) construction of drainage channels of about 300 metres (m) in Tai Wo;
(b) construction of drainage channels of about 800 m and stormwater drains of about 500 m in Shan Ha Tsuen;
(c) construction of drainage channels of about 800 m and stormwater drains of about 20 m in Ha Che;
(d) construction of drainage channels of about 600 m in Sung Shan New Village;
(e) construction of drainage channels of about 950 m and stormwater drains of about 250 m in Lin Fa Tei; and
(f) carrying out ancillary works
Major Improvements and Benefits
To enhance the drainage capacity of the existing drainage systems to lower the flood risks
Consultants
Atkins China Limited
Contractor
Wing Tat Civil Engineering Co. Limited
Contract No.
DC/2022/02
Project Commencement Date
29 May 2023
Project Completion Date
Mid 2027
Project estimate
About $529.1 million
Controlling Division
Project Management Division
Type
Flood Prevention
District
Yuen Long
Status
On-going
Other Information