In 2017-2018, DSD progressed well in sewage and flood prevention and garnered remarkable results. The Regulation of Shenzhen River Stage 4 and the first stage of maintenance works of penstocks at the Stonecutters Island Sewage Treatment Works (SCISTW) Main Pumping Station were completed in tandem.During the year, we continued to conduct research on various scopes of works and river channel ecology, while sparing no effort in exploring ways to develop our sewage treatment and drainage services, as well as to promote cross-sectoral collaboration and pioneer innovative technologies.
The Regulation of Shenzhen River Stage 4 was successfully completed in July 2017 at a construction cost of approximately $0.85 billion. The works involved improving a 4.5kilometre section of Shenzhen River between the Ping Yuen River estuary and Pak Fu Shan, and constructing a flood retention lake with a capacity of 80,000 cubic metres to upgrade flood prevention capacity of the area. We also introduced greenery and ecological conservation elements into the lake to create a wetland habitat.
[section4_1_large.jpg]
The DSD Research & Development Forum 2017 was successfully held on 14 November at the Hong Kong Science Museum. More than 500 local academics, professionals and industry representatives participated and exchanged ideas. Industry leaders, professors and experts were invited to deliver thematic speeches on "Smart, Green and Resilient Wastewater Management" and "Smart, Green and Resilient Stormwater Management", sharing their experience in the application of smart technologies for sewage treatment and stormwater drainage as well as the development of green innovation, so as to encourage sectorial collaboration and technological innovation development.
[section4_2_large.jpg]
[section4_3_large.jpg]
[section4_4_large.jpg]
From 6 to 31 January 2018, DSD co-organised with the Hong Kong Arts Development Council (HKADC) an art exhibition titled "After the Deluge" and offered the Tai Hang Tung Stormwater Storage Tank (THTSST) as an exhibition venue for the first time. This exhibition, created by a local artist, Mr. Kingsley NG, made use of the classic mythology of "Dayu Tames the Water" to bring out the contemporary "Dayu" story. While visiting THTSST, visitors could join a guided tour to learn more about the exhibits inside the tank.
[section4_11_large.jpg]
[section4_12_large.jpg]
Between 20 February and 4 March 2018, DSD completed the first stage of replacement of two large penstocks inside the Main Pumping Station No.1 (MPS1) of SCISTW. The maintenance works were being implemented in stages, involving five rounds of bypasses (including the first discharge which was completed). The whole project is scheduled for completion in 2020. Stage I works included detailed survey and dismantling of two existing penstocks weighing 10 tonnes and 3 tonnes respectively.
[section4_13_large.jpg]
[section4_14_large.jpg]
[section4_15_large.jpg]
[month_icon.png]
Apr
The website of the DSD (www.dsd.gov.hk) was bestowed the Honourable Mention Award under the “Government Departments” category of the “Best .hk Website Awards 2016”
[section4_5_1_large.jpg]
[month_icon.png]
May
DSD paper on the Solar Farm at Siu Ho Wan Sewage Treatment Works received the Merit Award of The Hong Kong Institute of Engineers’ 2017 Environmental Paper Award
[section4_5_2_large.jpg]
[month_icon.png]
Jun
DSD won the Winner Award in the “Contract Innovation through Additional Clauses” category from the United Kingdom's (UK) NEC Users' Group
[section4_5_3_large.jpg]
[top_bird1.png]
DSD Sustainability Report 2015-16 received a number of awards, including:
[vision_awards.png]
League of American Communications Professionals LLC
[inspire_awards.png]
League of American Communications Professionals LLC
[arc_awards.png]
MerComm, Inc.
[apex.png]
Communications Concepts, Inc.
[hkma.png]
[top_bird2.png]
[section4_1_31b_large.jpg]
The Hong Kong Management Association
[month_icon.png]
Sep
Happy Valley Underground Stormwater Storage Scheme won two awards at the Civil Service Outstanding Service Award Scheme in 2017. “Drops • Livability” was awarded the Gold Prize under “Team Awards (Specialized Service)” and “Unfettered Collaboration – The Encounter in Happy Valley” was awarded the Meritorious Award with the Leisure and Cultural Services Department (LCSD) under “Partnership Award”
[section4_5_4_large.jpg]
[section4_5_5_large.jpg]
[month_icon.png]
Oct
DSD paper on the Happy Valley Underground Stormwater Storage Scheme received the Publishing Award (Overseas Publication) from the Institution of Civil Engineers of the UK
[section4_5_6_large.jpg]
Ms. Ellen CHENG Nga-see, then Senior Engineer (fifth right), and Mr. Terry WONG Tze-ying, Engineer (third right), received Awards for Officers of Public Organisations at the Ombudsman’s Awards 2017
[section4_5_7_large.jpg]
[month_icon.png]
Nov
Ms. Winky CHUNG Lai-ching, Senior Clerical Officer (fifth right) and Mr. Wan Wai-chiu, then Works Supervisor I (third left), received commendation under the Secretary for the Civil Service's Commendation Award Scheme
[section4_5_8_large.jpg]
[top_bird2.png]
Pillar Point Sewage Treatment Works was awarded the 2016-2017 Luban Prize for Chinese Construction Projects
[section4_5_9_large.jpg]
[top_bird1.png]
Advance Works for Shek Wu Hui Sewage Treatment Works – Further Expansion Phase 1A and Sewerage Works at Ping Che Road was awarded Autodesk Hong Kong BIM Awards 2017
[section4_5_10_large.jpg]
Kai Tak River Improvement Works was bestowed the Association of Consulting Engineers of Hong Kong (ACEHK) Annual Award 2017
[section4_5_11_large.jpg]
[month_icon.png]
Dec
DSD Volunteer Team was awarded the Hong Kong Volunteer Award of Social Welfare Department – Gold Award (Organisation) by the Social Welfare Department
[section4_5_12_large.jpg]
[top_bird2.png]
Supercritical Vortex Intakes for Hong Kong West Drainage Tunnel won the First Prize of Construction Sustainability in CIC Construction Innovation Award 2017
[section4_5_13_large.jpg]
[month_icon.png]
Mar
DSD's exhibit “Energy Revives in Blossoms” was awarded the Grand Award for Outstanding Exhibit (Landscape Display) at Hong Kong Flower Show 2018
[section4_5_14_large.jpg]
[Full Report] [Traditional Chinese Version] [Simplified Chinese Version] [Graphical Version] [Sitemap]
Home | Director's Statement | About this Report | River Revitalisation for the Good of Water | Highlights of the Year | Governance Approach | Our Core Responsibilities | Environmental Management | Caring for Our Staff | Media Engagement Activities | Stakeholder Engagement Activities |
(c) Copyright 2018 Best viewed by MS IE 10.0 or above with resolution 1024 x 768.