Newsletter Vol. 8

Newsletter Vol. 8
Download PDF Version

Enhancement Works for Kwun Tong Sewage Pumping Station

To cater for future development of East Kowloon, the Drainage Services Department (DSD) is carrying out enhancement works at the Kwun Tong Sewage Pumping Station (KTSPS), which is situated near Kwun Tong Bypass and Wai Yip Street. The enhancement works commenced in late 2017 and are scheduled for completion in end 2022. This newsletter provides the latest information on the progress of construction and related information of the project.

Construction Sequence of the Project

Item Status
Enclosure of Site Area Completed
Ground Investigation Completed
Diversion of Underground Utilities Completed
Construction of Piles and Foundation Completed
Construction of ELS and Excavation for Balancing Tank In progress
Construction of Balancing Tank and its Associated Facilities In progress
Construction of Landscaped Deck  
Installation of Ventilation System and Deodorization Facilities  
Construction of the Connecting Roads and the Ancillary Works  
Testing of Associated E&M Equipment  
Beautification of Landscaped Deck and Installation of Playground Facilities  
Testing & Commissioning  

Open to Public

The aerial photo above shows the latest general view of the construction site.

The aerial photo above shows the latest general view of the construction site.

Design concept of landscape deck play space: Playful Nature

The user survey conducted by DSD in July 2019, showed “interactive water feature” and “amenity lawn” are most welcomed by users. Based on the result, Playright wishes to integrate natural elements with play space, and help children living in urban setting to use play to reconnect with the nature.  

The park is close to the neighborhood, the river and the promenade, providing a lot of opportunities to make close contact with the nature. The Playful Nature design ride on its advantage and transform the natural environment into a place for play and social interaction.  

Natural elements such as Sky, Sun, Air, Ground and Water interacting with facilities, people, plants and animals. 

Play Zone 1

The amphitheater acts as a lookout to the sea, and a space for children’s socio-dramatic play. You may walk, crawl, climb, slide to the bottom of the stage, or just sit down and relax.  

Age Range: 2 years old or above  

Main Play Experience: Balancing, Loose Parts, Climbing, Swinging and Rotating  

Play element: Little Mountain 

Play element: Little Mountain  

Play Zone 2 

This is a quiet and harmonic environment with grass mound, wind pavilion and small cabins. Toddlers and caretakers may start a small adventure at the sandpit and between the shrubs. 

Age Range: 0 years old or above  

Main Play Experience: Balancing, Sliding, Crawling/Walking, Cozy Space and Sensory  

Play element: Natural Hideout 

Play element: Natural Hideout  

Play Zone 3  

Children may jump on the Bouncing Clouds to reach to the sky, or walk with the trees on the treetop nets at the highest area of the deck.  

Age Range: 5 years old or above, 13 years old or above  

Main Play Experience: Jumping & Bouncing, Hide and Seek, Walking/Running/Rolling, interacting with natural elements and socialising 

Play element: Bouncing Clouds 

Play element: Bouncing Clouds  

Play Zone 4  

Sunlight goes through a colourful shelter, create a rainbow-like pathway, an excellent spot for playing with light and shadow.  

Age Range: 4 years old or above, 13 years old or above  

Main Play Experience: Manipulation, playing with shadow and Sensory – Sound  

Play element: Rainbow Tunnel

Play element: Rainbow Tunnel  

Play Zone 5 

Children’s sensory are fully engaged, they may climb to the top of tree house or tree deck to overlook the landscape, they may also take the slide and enjoy the aquatic play features.  

Age range: 5 years old or above 

Main Play Experience: Sliding, Socialising, Sensory – Tactile, Climbing and Interacting with natural elements 

Play element: Water Garden and Tree Deck 

Play element: Water Garden and Tree Deck 

Play element: Water Garden and Tree Deck  

The design concept and rendering are presented by Playright Children’s Play Association (2020 August Edition)  

*The design concept and rendering are presented by Playright Children’s Play Association (2020 August Edition)  

Engaging our Neighbours

The Drainage Services Department and the project team updated the project progress with Kwun Tong District Council member Mr. Li Wai-lam and his team; Mr. Hung Chun-hin, Ms. Leung Yik-ting and Mr. Cheng Keng-ieong; Mr. Wong Chi-ken and Ms. Wong Ka-ying (Chairman and Vice-chairman of the District Facilities Management Committee of Kwun Tong District Council), and obtained their views (such as the theme, layout, play and recreational facilities to be provided etc.) on the project in 22nd May, 15th July and 20th August 2020 respectively.

The Drainage Services Department and the project team updated the project progress with Kwun Tong District Council member Mr. Li Wai-lam and his team; Mr. Hung Chun-hin, Ms. Leung Yik-ting and Mr. Cheng Keng-ieong; Mr. Wong Chi-ken and Ms. Wong Ka-ying (Chairman and Vice-chairman of the District Facilities Management Committee of Kwun Tong District Council), and obtained their views (such as the theme, layout, play and recreational facilities to be provided etc.) on the project in 22nd May, 15th July and 20th August 2020 respectively.

The Drainage Services Department and the project team updated the project progress with Kwun Tong District Council member Mr. Li Wai-lam and his team; Mr. Hung Chun-hin, Ms. Leung Yik-ting and Mr. Cheng Keng-ieong; Mr. Wong Chi-ken and Ms. Wong Ka-ying (Chairman and Vice-chairman of the District Facilities Management Committee of Kwun Tong District Council), and obtained their views (such as the theme, layout, play and recreational facilities to be provided etc.) on the project in 22nd May, 15th July and 20th August 2020 respectively.

The Drainage Services Department and the project team updated the project progress with Kwun Tong District Council member Mr. Li Wai-lam and his team; Mr. Hung Chun-hin, Ms. Leung Yik-ting and Mr. Cheng Keng-ieong; Mr. Wong Chi-ken and Ms. Wong Ka-ying (Chairman and Vice-chairman of the District Facilities Management Committee of Kwun Tong District Council), and obtained their views (such as the theme, layout, play and recreational facilities to be provided etc.) on the project in 22nd May, 15th July and 20th August 2020 respectively.

Contact Us

Contract No. DC/2017/05
Contractor China Geo-Engineering Corporation
Project Hotline 6466 2466
Email pro@dc201705.com.hk
Consultant Atkins China Limited
Back to Top