Major Flood Control Projects
Major Flood Control Projects in Northwestern
NT
Table A1.1 Completed Projects
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
Village flood protection for the San Tin villages
and Chau Tau Tsuen, North West New Territories |
232
|
End 96
|
End 99
|
Construction of floodwater pumping stations in San Tin
and Chau Tau
|
North West New Territories development
main drainage channels for Yuen Long and Kam Tin - stage 1 phase
2 |
349
|
End 95
|
Mid 99
|
Training of Kam Tin River
|
North West New Territories development
main drainage channels for Yuen Long and Kam Tin, stage
1 phase 1 |
557
|
End 93
|
Mid 99
|
Training of Shan Pui River and Kam Tin River
|
Village flood protection for Sha Po Tsuen, Kam
Tin, New Territories |
75
|
End 96
|
Early 00
|
Construction of floodwater pumping station in Sha Po Tsuen
|
Main drainage channels for Yuen Long and Kam Tin
stage 2 - Kam Tin Road to Tai Kek section |
235
|
Mid 99
|
Early 02
|
Construction of drainage channel from Kam Tin Road to Tai
Kek
|
Phase 1 village flood protection for Pok Wai and
Wang Chau, North West New Territories |
87
|
End 99
|
Early 02
|
Construction of floodwater pumping station in Pok Wai and
drainage channel
in Wang Chau
|
Tin Shui Wai development - village flood protection
works for Ha Mei San Tsuen |
46
|
Mid 97
|
End 98
|
Construction of floodwater pumping station in Ha Mei San
Tsuen
|
|
|
Table A1.2 Projects in Progress
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui
Wai drainage improvements, stage 1, phase 1 - Yuen Long and
Tin Shui Wai |
194
|
End 01
|
Mid 05
|
Upgrading of urban drainage in Yuen Long town, Ping Shan
and Hung Shui Kiu and bank raising in Tin Shui Wai
|
Rural drainage rehabilitation scheme, stage 2,
phase 1 - Nam Hang drainage improvement |
17
|
Mid 00
|
End 02
|
Construction of drainage channels in Nam Hang
|
Main Drainage Channels for Ngau Tam Mei, phase
2 - Ngau Tam Mei to Yau Mei San Tsuen section |
106
|
Early 00
|
End 02
|
Construction of drainage channel from Ngau Tam Mei to Yau
Mei San Tsuen
|
Village flood protection for Yuen Long, Kam Tin
and Ngau Tam Mei, North West New Territories, stage I - remainder |
125
|
End 01
|
End 04
|
Construction of floodwater pumping station in Wang Chau;
and Construction of Pok Wai drainage channel
|
Main drainage channels for Yuen Long and Kam Tin,
stage 2 - remainder |
266
|
Mid 01
|
Mid 03
|
Construction of drainage channels near Ng Ka Tsuen and
Shek Tau Wai
|
Main drainage channels for Yuen Long and Kam Tin
stage 2 - Kam Tin San Tsuen to Wang Toi Shan section |
315
|
Mid 99
|
Early 04
|
Construction of drainage channel from Kam Tin San Tsuen
to Wang Toi Shan
|
Main drainage channels for Ngau Tam Mei phase
1 - Yau Mei San Tsuen to Tai Sang Wai section |
360
|
End 99
|
Mid 03
|
Construction of drainage channels from Yau Mei San Tsuen
to Tai Sang Wai
|
Village flood protection for Chuk Yuen Tsuen and
Ha San Wai, North West New Territories |
123
|
End 00
|
Early 03
|
Construction of floodwater pumping station in
Chuk Yuen Tsuen and Ha San Wai |
Main drainage channels for Yuen Long and Kam Tin
- Sham Chung Channel |
93
|
Early 01
|
Mid 03
|
Construction of drainage channel in Sham Chung |
Village flood protection for Mai Po Lo Wai/Mai
Po San Tsuen, Ma Tin Tsuen and Shui Pin Wai, NWNT |
170
|
End 01
|
End 05
|
Construction of floodwater pumping stations in
Mai Po Lo Wai/Mai Po San Tsuen, Ma Tin Tsuen and Shui Pin Wai |
|
|
Table A1.3 Projects under Planning
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
Rural drainage rehabilitation scheme - NWNT |
68
|
Mid 03
|
End 05
|
Training of Mo Fan Heung Stream and Sha Po Stream
|
Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui
Wai drainage improvements, stage 1, phase 2 - Kam Tin and Ngau
Tam Mei |
300
|
End 03
|
Early 09
|
Construction of drainage channels in Kam Tin and Ngau Tam
Mei
|
NWNT Development - main drainage channels for
Yuen Long and Kam Tin - remainder |
135
|
Mid 03
|
Early 05
|
Construction of drainage channel in Tin Tsuen
|
Yuen Long Bypass floodway |
485
|
End 02
|
End 05
|
Construction of drainage channels in Yuen Long South
|
Main drainage channels and poldered village protection
schemes for San Tin, NWNT Phase 3, Part 1 - eastern main drainage
channel for San Tin |
360
|
End 02
|
End 05
|
Construction of the Eastern Main Drainage Channels in San
Tin
|
Village flood protection for Yuen Long, Kam Tin
and Ngau Tam Mei NWNT - stage II |
85
|
Mid 03
|
Mid 05
|
Construction of floodwater pumping stations in Tai Kiu
and Shui Pin Tsuen
|
Tin Shui Wai development - village flood protection
works for Sheung Cheung Wai, phase 1 - upgrading of existing
stormwater pumping station |
37
|
End 02
|
Mid 05
|
Upgrading of the existing floodwater pumping station in
Sheung Cheung Wai
|
Tin Shui Wai development - village flood protection
works for Sheung Cheung Wai, phase 2 - construction of interceptor
drains |
30
|
-
|
-
|
Construction of interceptor drains in Sheung Cheung
Wai |
|
|
Major Flood Control Projects in Northwestern
NT - including Shenzhen River
Table A2.1 Completed Projects
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
Rural Drainage Rehabilitation Scheme, stage 1,
phase 1A - rehabilitation works at Ng Tung River |
163
|
End 98
|
End 01
|
Construction of about 200 m drainage channels and box culverts
|
Rural drainage rehabilitation scheme, stage 1,
phase 1B - rehabilitation works at Sheung Yue River |
149
|
Early 99
|
End 01
|
Construction of drainage channel
|
Village flood protection for Tsung Pak Long and
Tai Tau Leng, New Territories |
99
|
Early 96
|
End 98
|
Construction of floodwater pumping stations in Tsung Pak
Long and Tai Tau Leng
|
Shek Wu Hui Development Package 4, engineering
works |
294
|
End 98
|
Early 02
|
River training in Area 30
|
River training works for the Lower River Indus
and River Beas |
243
|
Early 99
|
Early 01
|
Construction of drainage channel
|
Formation and servicing of Area 36, Fanling, phase
1 |
5
|
Early 99
|
Mid 01
|
Construction of drainage channel
|
Shenzhen River Regulation Project, stage I - improvement
to river bends at Lok Ma Chau and Liu Pok |
150
|
Mid 95
|
Early 97
|
Construction of drainage channel for river bends at Liu
Pok to Lok Ma Chau
|
Regulation of Shenzhen River stage II phase II
- improvement to river sections between Liu Pok and Lok Ma Chau
and from Lok Ma Chau to estuary |
349
|
Mid 97
|
Mid 00
|
Construction of drainage channels from Liu Pok
to Lok Ma Chau and Lok Ma Chau to estuary |
Regulation of Shenzhen River, stage II, phase
I - reprovisioning of border road between Lok Ma Chau and Tam
Kon Chau |
126
|
End 96
|
End 98
|
reprovisioning of border road |
|
|
Table A2.2 Projects in Progress
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
River training works for the Upper River Indus |
756
|
Mid 99
|
Early 03
|
Construction of drainage channel
|
Regulation of Shenzhen River, stage III |
498
|
End 01
|
End 06
|
Construction of drainage channel at Shenzhen River from
its confluence with River Indus to its confluence with River
Ganges
|
|
|
Table A2.3 Projects under Planning
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
Rural drainage rehabilitation scheme - River Ganges |
200
|
Early 03
|
Early 05
|
Construction of drainage channel at River Ganges
|
Drainage improvement in Northern New Territories
- package A |
686
|
End 04
|
Mid 09
|
Construction of drainage channels in San Tin,
Ping Kong, Kau Lung Hang and Ma Wat. Upgrading of urban drains
in Sheung Shui and Fanling Town |
Drainage improvement in Northern New Territories
- package B |
349
|
End 05
|
End 09
|
Construction of drainage channels in San Tin South,
Kwu Tung, Ma Tsao Lung and Fu Tei Au |
Drainage improvement in Northern New Territories
- package C |
345
|
-
|
-
|
Construction of drainage channels in Lung Yeuk Tau, Man
Uk Pin, Ta Kwu Ling, Ping Che and Lin Ma Hang
|
|
|
Major Flood Control Projects in West Kowloon
Table A3.1 Projects in Progress
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
West Kowloon drainage improvement, stage 1 works |
464
|
Early 98
|
Mid 03
|
Improvement of 8.7km of stormwater drains
|
West Kowloon drainage improvement, stages 2 phase
1 works |
1246
|
End 99
|
End 04*
|
Improvement of 23km of stormwater drains
|
West Kowloon drainage improvement, stage 2 phase
2 and stage 3 phase 1 works |
1609
|
Early 01
|
Mid 07
|
Construction of Tai Hang Tung flood storage tank and Kai
Tak stormwater transfer tunnel. Improvement of 11km of stormwater
drains
|
*Substantial completion date |
|
Table A3.2 Projects under Planning
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
West Kowloon drainage improvement, stage 3 phase
2 |
588
|
-
|
-
|
Improvement of 14km of stormwater drains
|
West Kowloon drainage improvement - Lai Chi Kok
Transfer Scheme |
773
|
-
|
-
|
Construction of Lai Chi Kok stormwater transfer tunnel
|
|
|
Other Drainage Projects
Table A4.1 Projects under Planning
Title
|
Estimated Construction
Cost ($M)
|
Start Date
|
Completion Date
|
Work Description
|
Drainage improvement in Sha Tin and Tai Po |
418
|
Early 05
|
Mid 09
|
Construction of drainage channels, stormwater drains and
stormwater pumping stations
|
Drainage Improvement in Sai Kung |
128
|
End 02
|
End 08
|
Construction of drainage channels
|
Sheung Wan Stormwater Pumping Station |
160
|
End 05
|
End 08
|
Construction of stormwater pumping stations
|
Drainage improvement in Tuen Mun and Sham Tseng |
77
|
-
|
-
|
Construction of drainage channels and stormwater
drains |
Drainage improvement in Northern Hong Kong Island
- Hong Kong West drainage tunnel |
1707
|
-
|
-
|
Construction of stormwater drainage tunnel |
Drainage improvement in Northern Hong Kong Island
- Lower catchment improvement |
184
|
-
|
-
|
Construction of stormwater drains |
Drainage improvement in Tsuen Wan, Kwai Chung
and Tsing Yi - urban drainage improvement works |
70
|
-
|
-
|
Construction of stormwater drains |
Drainage improvement in Tsuen Wan, Kwai Chung
and Tsing Yi - Tsuen Wan drainage tunnel |
1049
|
-
|
-
|
Construction of stormwater drainage tunnel |
Drainage Improvements in East Kowloon |
683
|
-
|
-
|
Construction of stormwater drains |
Drainage Improvements in Southern Lantau |
81
|
-
|
-
|
Construction of drainage channels and stormwater
drains |
|
|
|