Photo Gallery — October 2012
Aerial view of the site
Roof work in Spiral Ramp
All intakes site areas were bunded from existing stream or nullah to avoid water pollution and protection of water ingress into working area
Installation of Boulder Trap in stream
Slope work and hydroseeding work
Construction of Vortex Drop Shaft
Aerial view of the Site
Construction of Cascade at Outfall
Elevation view of Outfall
Construction of Box Culvert at Outfall