The Macau Institution of Engineers visited Happy Valley Underground Stormwater Storage Scheme
10 February 2018
The Macau Institution of Engineers visited Happy Valley Underground Stormwater Storage Scheme
Chairman of the Macau Institution of Engineers, Mr WU Chou-kit, and their members visited Happy Valley Underground Stormwater Storage Scheme in the afternoon of 10th February.
The project team introduced the vision and mission of DSD, as well as the strategy of flood prevention, innovative elements and design features of the HVUSSS, including the “Movable Weir” system, co-use of land arrangement, and the water harvesting system, etc. The guests then visited the turfed slope above the pump house and the underground stormwater storage tank.
Members of the Macau Institution of Engineers were briefed on DSD’s flood prevention work and Happy Valley Underground Stormwater Storage Scheme by the project team
Engineer of Drainage Projects Division, Mr LEUNG Cheuk-lun (middle) received souvenir from Chairman of the Macau Institution of Engineers, Mr WU Chou-kit (left)
Engineer of Drainage Projects Division, Mr LEUNG Cheuk-lun, introduced the operation of Happy Valley Underground Stormwater Storage Tank
Group photo of the members of the Macau Institution of Engineers and the project team in the underground stormwater storage tank