PWP No. 4179CD

Drainage improvement works in Kowloon City

Project Scope

The scope of the project comprises –
(a)   construction of an underground stormwater storage tank with a capacity of about 75 000 cubic metres, a stormwater pumping station and the associated above ground structure at Argyle Street Playground in Kowloon City;
(b)   re-provision and enhancement of Argyle Street Playground;
(c)   construction of stormwater drains of about 1.1 kilometres long with diameters ranging from 600 millimetres to 2.1 metres (m) and single cell stormwater box culverts of about 500 m long with inner widths ranging from 3 m to 3.6 m and heights ranging from 1.3 m to 1.6 m at Olympic Avenue, Kowloon City Road, Ma Tau Kok Road in To Kwa Wan, and Baker Street, Lo Lung Hang Street, Bulkeley Street and Dock Street in Hung Hom; and
(d)   carrying out ancillary works

Major Improvements and Benefits

To upgrade the capacity of the drainage system concerned and alleviate the flood risks in the vicinity of To Kwa Wan near Sung Wong Toi Road, Mok Cheong Street, Kowloon City Road, Ma Tau Kok Road, Hung Hom near Baker Street, Lo Lung Hang Street, Bulkeley Street and Dock Street

Consultants

CE 29/2022 (DS) - Binnies Hong Kong Limited

Contractor

Chun Wo – Kwan Lee – RenoPipe Joint Venture (Chun Wo Construction and Engineering Company Limited – Kwan Lee Holding Limited – RenoPipe Construction Company Limited Joint Venture)

Contract No.
DC/2024/04
Project Commencement Date
16 August 2024
Project Completion Date
Mid 2030
Project estimate

About $1,958.3 million

Controlling Division
Project Management Division
Type
Flood Prevention
District
Kowloon City
Status
On-going