Drainage Services Department

        

        

On-site Guided Tours

Address Available Visiting Time
Sha Tin Sewage Treatment Works No. 1 Shui Chong Street, Ma Liu Shui, Shatin
  • 10:00AM to 11:30AM or 2:30PM to 4:00PM
  • Mondays to Fridays, except Public Holidays
Stanley Sewage Treatment Works Wong Ma Kok Road, Stanley
Stonecutters Island Sewage Treatment Works Ngong Shung Road, Ngong Shuen Chau, Kowloon
Siu Ho Wan Sewage Treatment Works Cheung Tung Road, Lantau Island
Ngong Ping Sewage Treatment Works Ngong Ping Road, Ngong Ping, Lantau Island
Lai Chi Kok Drainage Tunnel No. 2 Butterfly Valley Road, Sham Shui Po
Happy Valley Underground Stormwater Storage Tank Happy Valley Recreation Ground, Sports Road, Happy Valley
  • From January to March
  • 10:00AM to 11:30AM or 2:30PM to 4:00PM
  • Mondays to Fridays, except Public Holidays
Kai Tak River

The section between Lok Sin Road and Shatin Pass Road

  • 10:00AM to 11:30AM or 2:30PM to 4:00PM
  • Mondays to Saturdays, except Public Holidays
Yuen Long Bypass Floodway
  • San Tin Stormwater Pumping Station, San Tin Tsuen Road, San Tin
  • Nam Sang Wai River Education Trail
  • 10:00AM to 11:30AM or 2:30PM to 4:00PM
  • Mondays to Saturdays, except Public Holidays
Yuen Long Bypass Floodway Eco Tour
  • San Tin Stormwater Pumping Station, San Tin Tsuen Road, San Tin
  • Yuen Long Bypass Floodway Engineered Wetland
  • Nam Sang Wai River Education Trail
  • From November to December
  • 10:00AM to 12:00PM or 2:30PM to 4:30PM
  • Mondays to Saturdays, except Public Holidays
Online Virtual Tours Available Time
Yuen Long Bypass Floodway Eco Tour - Online Virtual Tour
  • 10:00AM to 5:00PM 
  • Mondays to Saturdays, except Public Holidays

Happy Valley Underground Stormwater Storage Tank Online Virtual Tour

  • 10:00AM to 5:00PM 
  • Mondays to Fridays, except Public Holidays

Sha Tin Sewage Treatment Works Online Virtual Tour

Stanley Sewage Treatment Works Online Virtual Tour

Application Procedure

  1. Please return the completed Application Form by email (enquiry@dsd.gov.hk) at least 3 weeks prior to the date of visit. Members of the public may also apply for the visit via our Web-Form. Visits will be arranged on a first-come-first-served basis. (For the application of online virtual tour, please state the request in the Remarks.) 
  2. Upon receipt of the application, an email confirmation will be issued to the applicant informing the date and time of the visit.
  3. Participants shall arrange for their own transportation.
  4. For enquiries, please contact our staff at 2594 7073

Notes on Application

  1. No. and Age of Participants
 

No. of Participants (including teachers or staff)

Age of Participants

On-site Guided Tours                                                                                                                                                       

Min. 10;
Max. 26
(20 for Stanley Sewage Treatment Works)

Aged 9 or above
Online Virtual Tour Min. 10  
  1. Arrangements in Case of Inclement Weather
  • Under the following inclement weather conditions, all visits will be cancelled:
Facilities Before the visit During the visit

Sewage Treatment Works

If Tropical Cyclone Warning Signal
No. 3 or above;
or Red/Black Rainstorm Warning Signal is issued and still in force
3 hours before the visit is scheduled to begin

If Tropical Cyclone Warning Signal
No. 3 or above;
or Red/Black Rainstorm Warning Signal is issued during the visit

Lai Chi Kok
Drainage Tunnel

Kai Tak River

Yuen Long
Bypass Floodway &
Yuen Long
Bypass Floodway Eco Tour

Happy Valley
Underground Stormwater Storage Tank

If Tropical Cyclone Warning Signal
No. 1 or above;
or ANY Warning Signal is issued and still in force 3 hours
before the visit is scheduled to begin

If Tropical Cyclone Warning Signal
No. 1 or above;
or ANY Warning Signal is issued during the visit

(DSD will decide to continue or suspend the visit depending on the weather or the actual situation of the visiting venue)

  1. Personal hygiene
  • Do not smoke or eat during the visit. Please keep the venue clean and do not litter or spit.
  • If you feel unwell or need assistance during the visit, please notify DSD staff immediately.
  1. Personal safety
  • Visitors must follow the instructions of DSD staff and stay within the designated area for visit.
  • Visitors should not run, play, make noise or climb on railings, fences or slopes.
  • Visitors must not touch any electromechanical facilities.
  • In case of fire or bad weather, please keep calm and follow the instructions of DSD staff to take shelter in a safe place.
  • If the visitor's behavior causes nuisance to others, DSD staff has the right to ask the relevant person to leave.
  1. Others
  • Visitors should take care of personal belongings carefully.
  • DSD reserves the right, with advance notice given, to cancel any scheduled visit.
  • A notice for cancellation is required at least 3 days before the date of visit if participants who have been arranged to visit wants to cancel the visit booking. If participant cancels the visit without prior notice, DSD reserves the right to refuse the participant's applications to visit DSD facilities in the future.

Personal Data Collection Statement

  1. Purpose of Collection
    The personal data provided by means of this form will only be used for processing the application of visiting sewage treatment and flood prevention facilities, and distributing Drainage Services Department information. 

  2. Classes of Transferees
    The personal data you provide by means of this form may be disclosed to other government bureaux and departments and other organisations for the purposes mentioned in paragraph 1 above.

  3. Access to Personal Data
    You have a right of access and correction with respect to personal data as provided for in sections 18 and 22 and Principle 6 of Schedule 1 of the Personal Data (Privacy) Ordinance. Your right of access includes the right to obtain a copy of your personal data provided in this form subject to payment of a fee.

  4. Enquiries
    For enquiries concerning the personal data collected by means of this form, including the making of access and corrections, please contact us (Tel: 2594 7073/Address: Public Relations Unit, Drainage Services Department 43/F, Revenue Tower, 5 Gloucester Road, Wanchai, Hong Kong).

Back to Top