Skip to main content

Drainage Services Department - Sustainability Report 2018-19

Our Core Responsibilities

[Executive Summary] [Full Report] [Traditional Chinese Version] [Simplified Chinese Version] [Graphical Version] [Sitemap]

Home | About this Report | Director's Statement | Energy Saving and Emission Reduction Promoting Sustainable Development in Hong Kong | Highlights of the Year | Governance Approach | Our Core Responsibilities | Environmental Management | Caring for Our Staff | Stakeholder Engagement Activities

Our Core Responsibilities

DSD is committed to providing professional sewage treatment and stormwater drainage services to the public so as to protect the quality of Hong Kong waters and protect citizens against flooding. Since our establishment in 1989, we have been endeavouring to build excellent sewerage and drainage facilities to make Hong Kong a more liveable city.

Overview of Flood Prevention in 2018-19

picture 4.1

Planning, Design and Construction of New Drainage Facilities

picture 4.2 Kai Tak River Improvement Works (upstream and midstream sections) (Kai Tak River after Improvement)

pictue 4.3 Revitalisation of Tsui Ping River (Photomontage of the revitalised Tsui Ping River)

picture 4.4 West Kowloon Drainage Improvement – Interreservoirs Transfer Scheme (The location of the tunnel intake of Inter-reservoirs Transfer Scheme at the Kowloon Byewash Reservoir)

Overview of Sewage Treatment and Sewerage System in 2018-19

picture 4.5

Planning, Design and Construction of New Sewerage Facilities

picture 4.6 Upgrading of Mui Wo Sewage Treatment Works (Aerial photo of Mui Wo Sewage Treatment Works)

pictue 4.7 Dry Weather Flow Interceptors at Cherry Street, Tai Kok Tsui (The photomontage of the dry weather flow interceptor at Cherry Street)

picture 4.8 The photomontage of the completed Phase 1 Sha Tau Kok Sewage Treatment Works

picture 4.9 Relocation of Sha Tin Sewage Treatment Works to Caverns

pictue 4.10 The photomontage of the enhanced Kwun Tong Sewage Pumping Station

picture 4.11 The photomontage of the Shek Wu Hui Effluent Polishing Plant

picture 4.12 The design layout of Yuen Long Effluent Polishing Plant

Top

 

[Full Report] [Traditional Chinese Version] [Simplified Chinese Version] [Graphical Version] [Sitemap]

Home | About this Report | Director’s Statement | Energy Saving and Emission Reduction Promoting Sustainable Development of Hong Kong | Highlights of the Year | Governance Approach | Our Core Responsibilities | Environmental Management | Caring for Our Staff | Stakeholder Engagement Activities

(c) Copyright 2020 Best viewed by MS IE 10.0 or above with resolution 1024 x 768.