DSD is committed to providing world-class stormwater drainage and wastewater treatment services, enabling the sustainable development of Hong Kong. During the year, the largest environmental infrastructure project in Hong Kong, The Harbour Area Treatment Scheme (HATS) – Stage 2A was commissioned, which would improve the water quality of Victoria Harbour to provide better living environment and quality for the public.
For details about the drainage and sewerage facilities under planning, design and construction, please refer to the Full Report. |
The Harbour Area Treatment Scheme (HATS) is the largest environmental infrastructure project in Hong Kong, with an aim to improve the water quality of Victoria Harbour by collecting and treating sewage generated from both shores. The project has was implemented in two stages, with construction works spanning over two decades at a total cost of $25.8 billion.
With facilities for HATS Stage 2A came into full operation on 19 December 2015, all sewage from both sides of Victoria Harbour are now conveyed to a sewage treatment plant for treatment, disinfection and discharge into the western approaches of the harbour. This milestone for HATS marks the overall enhancement of water quality across the harbour.
Physical constraints were overcome by cutting-edge engineering techniques adopted in this project, enabling the construction of deep sewage tunnels totalling over 44 kilometres in length at depths up to 160 metres below sea level. HATS also involved upgrading the sewage treatment capacity of Stonecutters Island Sewage Treatment Works (SCISTW) to 900 million cubic metres per year, enabling it to serve more than five million citizens.
[section5_2_1.jpg]
[section5_2_20.jpg]
[section5_2_21.jpg]
[section5_2_22.jpg]
[section5_2_23.jpg]
[section5_2_24.jpg]
[section5_2_26.jpg]
[section5_2_25.jpg]
After the full commissioning of Stage 2A, all sewage from either side of Victoria Harbour is now collected, treated and disinfected prior to discharge. With the significant improvements in water quality, cross-harbour races resumed in 2011 after years of suspension at the east of the Victoria Harbour. As water quality of the beaches in Tsuen Wan district has also been improved drastically, closed beaches were reopened for public enjoyment.
[section5_2_18.jpg]
[Full Report] [Traditional Chinese Version] [Simplified Chinese Version] [Graphical Version] [Sitemap]
Home | Director’s Statement | About this Report | Highlights of the Year | Governance Approach | Our Core Responsibilities | Environmental Management | Stakeholder Engagement Activities | Joining Hands with Working Partners | Care for Our Staff |
(c) Copyright 2016 Best viewed by MS IE 8.0 or above with resolution 1024 x 768.