1.1
This Baseline Water Quality Monitoring Report was
prepared by Cinotech Consultants Ltd. for the Drainage Services Department’s (DSD)
Contract No. DC/2009/10
“HATS 2A –Upgrading works at Stonecutters Island Treatment Works – Main Pumping, Sedimentation Tanks and
Ancillary Facilities”. This report presents the baseline water quality
monitoring works performed for the Project from September 2017 to February 2018.
1.2
The
baseline water quality monitoring was conducted at 58 designated
monitoring stations, at
a frequency of one day per month in a six month period. The monitoring was
conducted for a total of 6 days at mid-ebb and mid-flood tides to monitor
the parameters including temperature dissolved oxygen, dissolved oxygen
saturation, turbidity,
salinity and E. coli.
1.3
During the baseline monitoring period, no marine
construction works, temporary sewage bypassing and other observable pollution
source were identified in the vicinity of the monitoring stations. The baseline
water quality data established in this report are considered to be
representative of the baseline conditions.
1.4
The
baseline data
were processed, reviewed and analysed to categorise the sampled data. The
Action and Limit Levels for dissolved oxygen, turbidity and E. coli are derived for impact monitoring (Tables 4.6a, 4.6b, 4.7, 4.8a and 4.8b).