EXECUTIVE SUMMARY

 

1.              This Baseline Environmental Monitoring Report was prepared by Cinotech Consultants Ltd. for the Project ¡§Harbour Area Treatment Scheme Stage 2A ¡V Construction of Sewage Conveyance System from Ap Lei Chau to Aberdeen¡¨. This report presents the baseline monitoring works performed for noise at M9 (Ap Lei Chau PTW) for the Project between 6th January 2010 and 19th January 2010.

Noise (Ap Lei Chau PTW)

2.              The baseline noise monitoring was conducted at one monitoring station (M9 - Ap Lei Chau PTW) between 6th January 2010 and 19th January 2010.

 

3.              Noise levels at the monitoring station were measured for a period of 14 consecutive days.  Monitoring Data collected was reviewed and analyzed.  Details of the locations and results are presented in this report. The baseline noise monitoring data was processed according to the following periods:

 

¡P               Daytime: 0700-1900 hrs on normal weekdays

¡P               Evening-time: 1900-2300 hrs

¡P               Holiday-time: 0700-1900 hrs on holidays

¡P               Night-time: 2300-0700 hrs of next day

 

Air Quality and Noise (Aberdeen PTW)

 

4.              Since Leighton Asia in joint venture with Leonhard Nilsen & Sonner AS (LNS) has been awarded contract for the construction of a sewage conveyance system from Aberdeen to Sai Ying Pun on Hong Kong Island, the air quality monitoring station at Dairy Farm Ice and Cold Storage (CM_AB1) and noise monitoring station at Wah Lai House, Wah Kwai Estate (M8) have been set up by ATKINS (ET of Contract Nos. DC/2007/24) to monitor the air quality and noise in the vicinity of the sensitive receivers. Please refer to baseline environmental monitoring report for Contract No. DC/2007/24 for details on monitoring parameters, frequency and programme, monitoring equipment, monitoring methodology and QA/QC procedures.